
WRITTEN INSTRUCTIONS
7-W1 – Snowshed Doorway with Diagrams Stage 1 (Kit Manufactured Before June 1, 2021)
Click on the link to view and print the snowshed doorway manual. Stage one instructions end with step 9. Do not begin glazing the doorway until you have glazed the rest of the Growing Dome.
7-W1 – Snowshed Doorway with Diagrams Stage 1 (Kit Manufactured After June 1, 2021)
Click on the link to view and print the snowshed doorway manual. Stage one instructions end with step 7. Do not begin glazing the doorway until you have glazed the rest of the Growing Dome.
VIDEOS
7-V1 – Snowshed Doorway Stage 1 – Wood Frame
Note: This video shows a 42′ dome, which may differ from your specific dome size. Refer to Written Instructions above for specific details. The vertical and horizontal pieces are not used on the 22′ dome. The 22′ door framing is drastically different than what is shown in this video. A new video will be posted soon. Refer to written instructions above.
Click on the link to go to the next step: 8. Foundation Wall Trim Strips