9. 22′ Reflectix & Glazing Triangles

Back to Table of Steps

Back to Previous Step

Attaching Reflectix & Glazing the Dome

WRITTEN INSTRUCTIONS

9-W1 – Reflectix & Glazing Triangles

Click on the link to view and print the written instructions on how to fasten the reflectix and glazing to the Growing Dome Structure. Also includes instructions on finishing the glazing panels next to the operable vents.

DIAGRAMS

Click on the link to view and print the diagram showing the screw patterns for the glazing triangles. 

VIDEOS

9-V1 – North Wall Reflectix Insulation

9-V2 – Glazing the Growing Dome


Click on the link to go to the next step: 10. Vent Installation Stage 2