19. 22′ Above Ground Pond Stage 2

Back to Table of Steps

Back to Previous Step

Above Ground Pond

WRITTEN INSTRUCTIONS

19-W1 – Above Ground Pond Stage 2

Click on the link to view and print the written instructions on how to install the pond liner, liner retainer, and “T” top brace.

DIAGRAMS

19-D1 – Pond Fabrication Step 2 (Same as 18-D2)

Click on the link to view and print the fabrication details for the above ground pond metal and “T” top brace crossbar.

Click on the link to view and print the above ground pond cross section diagram.

VIDEOS

19-V1 – Rectangular Pond Liner Installation

19-V2 – Drop-In Pond Liner Installation

Coming Soon . . .

19-V3 – Top Brace Fabrication

Coming Soon . . .


Click on the link to go to the next step: 20. Shade Cloth Installation