18. 22′ Above Ground Pond Stage 1

Back to Table of Steps

Back to Previous Step

Above Ground Pond Stage 1

WRITTEN INSTRUCTIONS

18-W1 – Above Ground Pond Stage 1

Click on the link to view and print the written instructions on how to install the above ground pond metal enclosure.

DIAGRAMS

18-D1 – Pond Fabrication Step 1

Click on the link to view and print the above ground pond layout diagram showing the basic layout of the pond and spacer block fabrication instructions.

18-D2 – Pond Fabrication Step 2

Click on the link to view and print fabrication details for the above ground pond metal and “T” top brace crossbar.

Click on the link to view and print the above ground pond cross section diagram.

VIDEOS

18-V1 – Above Ground Pond Excavation

18-V2 – Pond Metal Assembly and Installation


Click on the link to go to the next step: 19. Above Ground Pond Stage 2